Manufacturing in Intagya ERP: production plan, real cost and quality

Manufacturing in Intagya ERP: production plan, real cost, design and engineering, cutting plans, the shop floor screen, quality control and maintenance.

Manufacturing overview

Open Manufacturing and you see today's orders: how many of the planned ones are done, in progress or waiting for materials. Then three cards: late orders, orders waiting for components with a Buy button for what is short, and today's load on the lines and machines, plus a Needs you list. Lines and machines, costs and reports have their own tabs.

Key sections
  • Where to find it The first menu of the Manufacturing app, Overview, with four tabs: Today, Lines and machines, Costs and Reports.
  • Today's production Manufacturing orders planned for today: done, in progress and waiting for materials, compared with last week's average, with a chart of the last 14 days (done and planned).
  • Late orders Orders past their date, oldest first, each with an Open button.
  • Waiting for materials Orders without enough components, the missing component and quantity, and a Buy button that opens a purchase order for it when no shipment is on the way.
  • Work centre load Hours planned today against the hours each work centre has, with a warning when one is over capacity.
  • Needs you Draft orders not confirmed, orders produced but not closed, a stopped work centre, and scrap this week.
  • Work centres and reports A card per work centre with its state, the operations in its queue and its overall effectiveness (OEE) over 30 days. Reports: production analysis, work centre effectiveness and load, scrap and material consumption.
  • Decision tools A tab before Reports with Order sequencing: it orders the week's work on each machine so similar orders follow each other and less time goes to changeovers, while every order keeps its delivery date. See its own card in this section. The tab shows to anyone with the rights to at least one of its tools.

Manufacturing order sequencing

Orders the week's work on each machine so similar orders (colour, size, material) follow each other and less time goes to changeovers, while every order keeps its delivery date. Compare the current order with the suggested one, and a manufacturing manager approves it in one click.

Key sections
  • Where to find it In the Manufacturing app: Overview, then Decisions, then Order sequencing. Shown to manufacturing users; approving is for manufacturing managers.
  • What it shows A timeline of the week for each line or machine, with its orders coloured by family and the changeovers between them. Switch between Current order and Suggested order. At the top: changeover time and how much less, orders this week and on how many machines, how many orders are on their delivery date, and when the week ends.
  • What goes in Work orders not started yet and planned to start within 7 days, on your own lines and machines (outside work centres stay out), up to 60 per machine. Worked out when the page opens, from each machine's working schedule. The due date is the manufacturing order deadline or its planned end.
  • Families and changeovers The family is the value of an attribute you choose in the Manufacturing settings (Family of an order, for example Colour); left empty, it is the product category. The changeover time between two families is entered once per machine in Manufacturing, then Configuration, then Changeover times, and the way back takes the same time unless it has its own line. Each machine has a Default changeover; 0 means none.
  • How it orders After each order it picks the one with the smallest changeover, the earliest deadline breaking ties, then moves late orders earlier while that brings more orders in on time. Operations that wait for another one stay after it. When the suggestion is not better (more on time, then less changeover, then an earlier end), the current order stays.
  • Buttons Approve the order, for manufacturing managers: writes the planned start and end of the work orders in the suggested order and adds a note on each manufacturing order that changed. Changeover times opens their list.
  • What it never does It never touches running, finished or cancelled work orders, never changes quantities or machines, and nothing changes before the approval.

Production plan

For each product and each month or week: what we expect to sell, what is in stock, and what to make or buy and when. One click creates the manufacturing order or the request for quotation.

Step-by-step guide From the product to the manufacturing order, step by step
Key sections
  • Where to find it In the Manufacturing app: Planning, then Production plan. Manufacturing managers add products and set them up; the manufacturing team types the figures and creates the orders.
  • Expected demand You type it for each period, or the system suggests it from past sales. When confirmed sales are larger, the plan uses them.
  • Component demand Worked out from the bill of materials: what the open and suggested manufacturing orders of the products above need.
  • Suggested Safety stock plus demand and component demand, less the stock at the start and the open orders, kept between the minimum and the maximum order.
  • Order date Start of the period less the manufacturing time or the vendor lead time. When it has passed, the suggestion shows in red.
  • Orders A button in every cell, all orders of the current period at once, or automatically every morning for the products you choose.
  • Monthly and weekly The week starts on the day your language starts it, and takes its share of the monthly figure when you type none for it.

Monthly production plan

How much to make of each product this month for the most profit, from the confirmed and expected orders, the price and cost of each product, the hours of the work centers and the materials on hand. It names the resource that limits the profit and the value of one more hour of it, suggests an extra shift, and creates the manufacturing orders on approval.

Step-by-step guide What to make this month for the most profit, step by step
Key sections
  • Where to find it Manufacturing, then Planning, then Monthly production plan. It is not the Production plan, which works out what to make or buy and when for each period.
  • What it reads Confirmed sales not delivered yet and the expected demand (typed, or from the Production plan when you use it), less the stock and open orders. The sale price and unit cost, the hours of each work center in the month, and the materials in stock.
  • The result For each product the planned quantity, unit profit, product profit and status; the expected profit, the share of confirmed orders covered, and the Limiting resource with the value of one more hour or unit of it.
  • What if? Sets the plan back to draft so you change the hours of a work center or the quantity of a material under Resources, then calculate again.
  • Approving Approve and create manufacturing orders creates one order per product in the plan, and Confirm the manufacturing orders confirms them once created.

Manufacturing to custom designs

Each order has its own sizes, materials, colours and drawing. Sales types the specs on the quotation, the customer approves them from a link, then the manufacturing order is created with its components worked out from the sizes, and the worker sees them at every stage.

Step-by-step guide From the quotation to the worker screen, step by step
Key sections
  • Where to find it In the Manufacturing app: Configuration, then Settings, then the Manufacturing method block, then Manufacturing to custom designs. It is off until you turn it on.
  • Spec templates Each product category gets a template with its fields: numbers with a lowest and highest value, a choice from a list, text, and an attachment. Sub-categories follow the template, and the closest category wins.
  • Components from sizes One rule per component written with the field names, such as the number of tubes from the width and height, with an optional condition and a product by choice, such as the paint for each colour.
  • Price An optional rule works out the unit price on the quotation from the sizes; salespeople can still change it by hand.
  • Customer approval A link by e-mail opens a page with the sizes, the drawing, the files and a signature, where the customer approves or asks for a change. After approval the order confirms itself.
  • Manufacturing order One manufacturing order per custom line, with a Customer specs card, the source of every component, and a warning when the specs change after work has started.
  • Worker screen Big sizes, the notes and the drawing, and checks the worker ticks before finishing a stage. It works on a tablet.
  • When no template fits If every order is new and no fixed template fits it, turn on Pricing by the design team under this option: the design team builds a cost sheet before the quotation. See the Design and engineering card.
  • Turning it off When you turn the option off, its buttons and menus hide, and saved specs stay as they are.

Design and engineering

For a factory where every order is new: sales asks the design team for a price, the designer builds a cost sheet of materials and work, and the price lands on the quotation as cost plus margin. Once the customer approves, the system buys only what is missing and compares the estimate with the actual cost.

Step-by-step guide From the spec request to the manufacturing order: pricing first, step by step
Key sections
  • Where to find it In the manufacturing settings, Manufacturing method block: turn on Manufacturing to custom designs first, then Pricing by the design team. The Design and engineering app then shows in the app list.
  • A request from sales The Custom order request button on the quotation opens one window: the product name as the customer sees it, the quantity, the date, the spec in the customer's words and the files. The quotation cannot go to the customer before the price arrives.
  • The cost sheet Materials from the system, or typed as text when they are new; work lines priced at the work centre hour cost; other costs; and a waste rate. Each material shows the stock on hand and the last purchase price, with a warning when that price is old.
  • Similar past orders The system searches the words of the name and the spec among orders priced before, shows a match percentage, and copies their materials in one click.
  • The price on the quotation Price = expected cost + margin. Sales changes the margin in the Custom orders tab and the price follows. The designer never sees selling prices; the salesperson sees only the total cost.
  • After the customer approves The system creates a product and a bill of materials for this order, a normal manufacturing order, and requests for quotation for the missing quantities only, with the expected price and the difference beside them.
  • Follow-up The order pipeline page shows each order with its seven stages and the days spent in each; the overview shows open and late requests and estimate accuracy.
  • Worksheets One PDF per stage and per production line, from the cost sheet to the bill of materials, the work order and the worker screen. Change the line and the file changes.
  • Permissions Two jobs in the permissions screen: Designer and Engineering manager.

Real production cost

The cost of every manufacturing order as it was really spent: materials from stock, the work of each line or machine at an hour rate built from the accounts (salaries, depreciation, power and its share of factory overheads), scrap, then the profit. A report shows the products sold below their cost.

Step-by-step guide Real production cost: from the accounts to the cost of every order, step by step
Key sections
  • Where to find it In the Manufacturing app, the Costs menu: Lines and machines, Factory overheads, Order costs, Product profitability and Cost centres. No new app icon. The accountant also has a Factory overheads close shortcut in the Accounting menu.
  • Line or machine A work centre is now called a line or machine, with a type: production line, machine or work table. Each line gets its own cost centre, created by the system, renamed and archived with it.
  • The hour rate Built from four parts: crew salaries from the payroll entries, machine depreciation from the Assets app, power and running costs from the meter bills, and the line's share of factory overheads (rent, water, supervision), spread every month by the hours actually worked.
  • The month close Before a month is closed the rate is an estimate from the last closed month, with the overhead share averaged over the last three closed months. Closing the month puts the actual figures in place of the estimate on every order of that month.
  • Freight and delivery Freight and customs on purchases go onto the cost of the materials (landed costs). Delivery and installation for the customer go on the sales order, not on the product.
  • The order cost The Real cost tab of the manufacturing order: materials as issued from stock, the work of each line with its hours, salaries, depreciation, running costs and overheads, scrap, the cost per unit, and the profit against the selling value.
  • Reports Order costs for every order, and Product profitability for every product with its real cost and average selling price, products sold at a loss in red.
  • Permissions Manufacturing managers and accountants see the Real cost tab and the Costs menu. A manufacturing manager or an accountant closes the month; only an accounting manager reopens it.

Cost variances

After each priced order is delivered, the system splits the difference between the actual and the expected cost into its reasons, in figures: material price, material quantity, hour rate, hours and other costs. So you know whether to look at purchasing or at the workshop.

Step-by-step guide Why did the cost change? Cost variances after delivery, step by step
Key sections
  • Where to find it In the Design and engineering app: the After delivery tab of every pricing request whose manufacturing has ended, and the Cost variances report in the Reports menu.
  • The five reasons Material price difference, material quantity difference, hour rate difference, hours difference and other costs. Together they equal the difference between the actual and the expected cost exactly.
  • Colours Over the expected cost in red, under it in green.
  • Where the figures come from Expected from the cost sheet. Actual from the real cost of the manufacturing order: materials issued from stock and scrap at their stock value, and the hours of each line or machine at the cost the real cost gave them.
  • Permissions The design team, sales managers and purchasing users see the table and the report. Only the design team has the Recompute button.

Line load

The Line load tab of Order tracking: the hours of work each line or machine needs every week against the hours its working schedule gives, for the next six weeks. Overloaded weeks show in red at the top of the page.

Step-by-step guide Line load: can the factory take the orders of the coming weeks?
Key sections
  • Where to find it In the Manufacturing app: Order tracking, then the Line load tab beside the Orders tab.
  • Hours needed The hours left in the open work steps of confirmed manufacturing orders: expected time minus the time already worked. A step late on its week counts in the current week and is marked late.
  • Hours available From the working schedule of the line or machine, minus its time off and the public holidays of that schedule. The current week counts in full, like the others.
  • Colours Under 85% green, 85 to 100% amber, over 100% red.
  • Left out Lines run by a subcontractor, draft manufacturing orders, and work planned after the six weeks.

Line scheduling

The system spreads the open manufacturing orders over the work centers by deadline, shift hours and maintenance, shows a board per center, and shows which order will be late before it is late, with a suggestion. Approving writes the planned start and end on the orders.

Step-by-step guide A line schedule from your deadlines, step by step
Key sections
  • Where to find it Manufacturing, then Planning, then Line scheduling. It needs manufacturing orders with work orders on work centers.
  • What it reads The open work orders: work center, duration, order of the steps and alternative centers; the deadline of each order; the shift hours of each center; and the blocked periods.
  • Three goals Best for deadlines, Fewest product changes and Lowest cost.
  • The result Four cards against the current order sequence, a board per work center, and Orders that need your attention with a suggestion for each.
  • Approving Approve schedule writes the planned start and end of every work order and manufacturing order. If work orders changed after the calculation, the system asks you to compute again.
  • How it differs from Order sequencing The Order sequencing tool in the Decisions tab orders the week on each machine so less time goes to changeovers. Line scheduling plans all work centers together for up to 60 days, with steps that follow each other and maintenance.

Cutting plans

Type the size of the material and the pieces you need, and the system works out the way to cut the rods or sheets that uses the least material, compares it with cutting by hand, draws every rod or sheet with its pieces and leftovers, prints the cutting sheet and reserves the material in a transfer to production.

Step-by-step guide The least waste when cutting rods and sheets, step by step
Key sections
  • Where to find it Manufacturing, then Operations, then Cutting plans. A Cutting plans button on the manufacturing order opens its plans, or starts a new one with the first component of the order as the material.
  • Two kinds of cutting Linear cutting for pieces by length out of rods or profiles, and Sheet cutting for pieces by length and width out of sheets, where a piece may be turned by 90 degrees.
  • Sizes Sizes are in metres and the kerf in millimetres (what the blade removes on every cut). A leftover at least as long as the Minimum useful leftover goes back to stock and is not counted as waste.
  • The result Four cards against cutting by hand: raw items used, waste %, length or area saved and its value, and the leftovers back to stock. Then a drawing of every rod or sheet.
  • Cutting sheet and cutting order Print cutting sheet for the cutting floor, and Create cutting order reserves the full rods or sheets in one transfer from stock to production, which the warehouse validates.
  • Unit of the material The material is counted in units (one rod or sheet each), in metres for linear cutting, or in m² for sheets.

Shop floor

The Shop floor screen works in the browser of any tablet or phone, with no app to install. Each line has cards for its ready and running stages. The worker scans a badge or picks a name, starts, pauses and finishes the stage, records scrap, and the real time is logged by itself.

Step-by-step guide Shop floor and the worker screen: from a ready stage to a finished one
Key sections
  • Where to find it In the Manufacturing app: Shop floor in the top menu. Every work step also has a Worker screen button. It runs in the browser of a tablet or phone and needs no phone app.
  • For every factory It works for every factory, with Manufacturing to custom designs on or off. The checks before finishing a stage come from the order specs when the order has specs.
  • Real time Start, pause and finish log the time in the time log of the line or machine, with the name of the worker. Pausing from the screen stops every open time on the stage.
  • The team The Team field of a line or machine: the names offered on the screen. Left empty, the employees of the company show.
  • Permissions Manufacturing users open it, and the system checks the access on every press.

Product change orders

Every change to the components of a product goes through a change request with a reason, approved by a manufacturing manager; then a new version of the components is made and the old one archived. Open orders never change silently: you see them and choose to update or keep each one.

Step-by-step guide Product change orders: from the request to the new version, step by step
Key sections
  • Where to find it In the Manufacturing app: Products, then Product changes. The product components screen has a Request a change button, a Version field and a Changes button.
  • What can change Components: add, remove or change the quantity. Work steps, when they are on: add, remove or change the time.
  • States Draft, then To approve, then Approved, then Applied. Or Refused.
  • Approval A manufacturing manager approves directly. The Product change path in the Approvals app ships switched off; switching it on sends every request through Approvals.
  • Permissions A manufacturing user requests and sends a change. A manufacturing manager approves, refuses, applies, and decides for each open order.

Quality control

An inspection sheet for every production stage, from receiving materials to delivery, with items, a method and an acceptance rule, sign-offs that only their owners fill in, and quality alerts for what fails.

Step-by-step guide From the stage to the validated sheet, step by step
Key sections
  • Where to find it The Quality Control app in the production section. An administrator adds it from Add an app, and it is suggested to everyone who uses Manufacturing.
  • Stages The app starts with three general stages that suit any factory, and from the settings you load the stages of your kind of factory: steel and metal fabrication or furniture. Then you change them or add your own.
  • When a sheet is created When a receipt, a manufacturing order or a delivery is confirmed, one sheet for each stage of that operation. A manual stage opens its sheet by hand.
  • Products Link each stage to the product categories that go through it, so a product gets the sheets of its own stages only. A stage with no categories covers every product.
  • Block validation When it is on for a stage, the receipt or delivery is not validated and the manufacturing order is not closed until its sheet is validated.
  • Sign-offs Each role has its own users or group, and no one else signs it. A role with nobody set is signed by a quality manager.
  • Alerts A quality alert from the failed items in one click, with a team, stages, a root cause and a corrective action.

Production Management

Plan and monitor manufacturing, define bills of materials (BOM), and schedule production orders and work steps, so lines run efficiently and the finished product meets quality.

Key sections
  • Manufacturing Orders Each order with its product, quantity and component availability.
  • Work Orders Operation steps on the work centers.
  • Bills of Materials The components of each product and their quantities.
  • Unbuild Orders and Scrap Take a product back to its components, and record scrap.
  • Reporting Work orders and overall equipment effectiveness (OEE).

Equipment Maintenance

Upkeep of your own factory equipment and production lines: a record for each machine, maintenance requests for breakdowns, preventive maintenance on schedule, maintenance teams and breakdown analysis. It is not the Repairs app, which is for customers' devices.

Key sections
  • Equipment A record for each machine or production line, with its category, the team that looks after it and its breakdown history.
  • Maintenance Requests Each breakdown or job in a request with the equipment, technician and priority, in columns by stage. A request is corrective, for a breakdown that happened, or preventive, repeating on schedule.
  • Maintenance Calendar Upcoming maintenance on the calendar.
  • Breakdown reasons A reason for each breakdown, so Root Cause Analysis shows what stops your equipment most.
  • Reporting Maintenance requests analysis, overall equipment effectiveness and losses analysis.
  • Scheduled maintenance In the Scheduled maintenance tab of the equipment pick the Meter unit, Running hours or Kilometres, and record the Meter readings, with a Meter photo if you like; a reading lower than an earlier one is refused. Then Add maintenance item: Every (time), Every (meter) or both, and a preventive request opens with whichever comes first, with its Checklist, Responsible worker and Backup. The tab shows the Next maintenance and a 12-month calendar.
  • Checklist and supervisor approval The worker ticks the Checklist and records the downtime and the failure, and a request with an open checklist item cannot be closed. When you switch on Supervisor approval of maintenance in the Maintenance settings, Machine maintenance block (off at first), the worker presses Finished: send to supervisor, and the Maintenance supervisor presses Supervisor approval to close the request, or Return to the worker with a note.
  • Configuration Maintenance teams, equipment categories and maintenance stages.