Real production cost: from the accounts to the cost of every order, step by step

The system builds the cost of every manufacturing order from what the accounts really hold, with nobody typing an hour rate by hand. You set up once the factory overhead accounts, the machines, the crew of each line and the factory departments. Then the system works every month: an hour rate for each line, a real cost for each order and a profitability figure for each product. The pictures show an iron and aluminium factory with sample data, in the Arabic interface. It needs the Manufacturing and Accounting apps, and uses Payroll and Assets when they are installed.

Part of Real production cost
  1. 1. Factory departments and accounts Open Manufacturing, then Configuration, then Settings, and scroll to the Real production cost block. In Factory departments pick the departments whose people work in the factory but not on one line, such as supervisors and storekeepers: their salaries count as factory overheads. In Factory overhead accounts press Chart of accounts to mark the factory accounts once.
    1. Factory departments and accounts
  2. 2. Mark the factory overhead accounts The chart of accounts has a Factory overheads column. Switch it on for every account the whole factory spends on, such as factory rent, water, administration and supervision salaries and general maintenance. What is posted on these accounts and not on the cost centre of one line is spread over the lines every month by the hours worked. What is posted on the cost centre of one line, such as its crew salaries, its machine depreciation or its own meter bill, goes straight to that line and is not spread a second time.
    2. Mark the factory overhead accounts
  3. 3. Lines and machines Open Manufacturing, then Costs, then Lines and machines. These are your former work centres under their new name. Each has a Type, production line, machine or work table, and the Cost centre the system created for it. Beside them are the computed real hour rate and the hour cost typed by hand before, so you can compare them.
    3. Lines and machines
  4. 4. Crew, machines and power Open the line and go to the Hour rate tab. Under Where the cost comes from, add to Crew the employees who work on it: their salaries go to its cost centre. In Machines (from the assets) pick its machines from the Assets app, so their monthly depreciation goes to its cost centre. If it has its own electricity meter, tick Own electricity meter so its meter bills are posted on its cost centre; otherwise power counts as a factory overhead. The running cost per hour is used only until the first month is closed.
    4. Crew, machines and power
  5. 5. The real hour rate The other side of the tab shows the real hour rate in its four parts, salaries per hour, depreciation per hour, running per hour and factory overheads per hour, and their total. Rate source says where the figure comes from, such as an estimate from October 2026. Press Compute the hour rate after any change; the system also computes it again every day. The line's hour cost is kept equal to the real rate, so cost sheets and manufacturing orders use it.
    5. The real hour rate
  6. 6. The month close Open Costs, then Factory overheads, or Factory overheads close in the Accounting menu for the accountant. The month shows the total factory overheads, the hours actually worked, the overheads per hour and the estimate used before closing. The Lines and machines tab shows for each line its hours, salaries, depreciation, running costs, overhead share and hour rate. Press Close the month: the system puts the actual figures in place of the estimate on every order of that month. If a late bill arrives, an accounting manager reopens it with Reopen.
    6. The month close
  7. 7. The real cost of a manufacturing order Open a finished manufacturing order and go to the Real cost tab. At the top: materials at the value issued from stock, line work with its hours, scrap, and the real cost with the cost per unit. Then the selling value and the profit with its share of the selling value. Below is one row per line or machine that worked on the order: hours, salaries, depreciation, running costs, factory overheads and total. The selling value comes from the sales order line the order was made for, else the product's average selling price over the last three months. Compute again works it out again.
    7. The real cost of a manufacturing order
  8. 8. Order costs Open Costs, then Order costs: one row per order with materials, work, real cost, unit cost, selling value, profit and its rate, losses in red. The Estimate column is ticked for orders whose factory overheads are still an estimate because their month is not closed.
    8. Order costs
  9. 9. Product profitability Open Costs, then Product profitability. For each product: the number of orders, the quantity produced, the real unit cost, the cost recorded on the product, the average selling price and the profit rate. The Losses first filter puts products sold below their cost at the top in red, and the Sold at a loss filter shows only them.
    9. Product profitability
  10. 10. The Costs tab The Manufacturing overview has a new Costs tab: production cost this month for finished orders, split into materials, salaries, depreciation, running costs and factory overheads, with a chart of the real unit cost against the average selling price. Then cards for products sold at a loss, the dearest hour, to see where running costs go, and the month close with the last closed month. The needs-you list shows what is missing for an accurate cost, such as a line with no machines from the assets, with a Complete it button.
    10. The Costs tab
  11. 11. Freight and delivery Every cost screen sits in the Costs menu inside Manufacturing. For a correct material cost, post freight and customs on the receipt of materials as landed costs, so they enter the material cost and then the order cost. Delivery and installation for the customer go on the sales order, because they belong to that order, not to the product.
    11. Freight and delivery