A line schedule from your deadlines, step by step
Line scheduling is part of the Manufacturing app and shows when it is switched on in your workspace. Nothing changes on the manufacturing orders until you press Approve schedule. The calculation runs on an optimisation engine on the server: if a message says it is not installed, contact support.
-
1. Create a schedule and set its span Open Manufacturing, then Planning, then Line scheduling and press New. Type the First day, the Working days (1 to 60), the Weekly day off and when the shift starts.
-
2. Pick the goal and the search time In Goal: Best for deadlines, Fewest product changes or Lowest cost. Search time (seconds) goes from 5 to 120.
-
3. Load the work centers and their hours Press Load work centers: the system adds every work center with open work orders, and its alternative centers. Check the Shift hours a day of each center; the Cost per hour is read from the work center.
-
4. Add the blocked periods In the Blocked periods tab, one line per maintenance or stop: work center, From, To and the reason. The system puts no work on a center during its blocked period.
-
5. Compute the schedule and read the board Press Compute schedule. Four cards show: Orders delivered on time, Line use, Late orders and Product changes, each with the figure of the current order sequence under it. Then the Proposed schedule: a lane per work center with its daily capacity, and the work orders on their days. If the search time ended before the best schedule was proven, the system says so.
-
6. Review the orders that need your attention Orders that need your attention lists every order that Will be late or is On the edge, with its deadline, expected finish and a suggestion, such as extra hours on a work center up to a given day, or agreeing a new date when the steps alone take longer than the time left. The Orders and Planned work orders tabs hold the full detail.
-
7. Approve the schedule Press Approve schedule: the planned start and end of every work order and manufacturing order in the schedule are written. If work orders were started, added or moved since the calculation, the system asks you to Compute again before approving.