From the quotation to the worker screen, step by step
This option suits a factory that makes every piece to order: gates, kitchens, aluminium, furniture. The pictures show a made-to-order iron gate with sample data, in the Arabic interface. It needs the Manufacturing and Sales apps, and the product needs a bill of materials.
-
1. Turn the option on Open Manufacturing, then Configuration, then Settings, and in the Manufacturing method block turn on Manufacturing to custom designs. Under it are four options: ask the customer to approve the specs before manufacturing starts, compute the components from the sizes, and alert production when the specs change after work has started; these three are on from the start. The fourth, show the drawing on the worker screen at every stage, is off from the start, and while it is off the drawing shows on the first stage only. Then press Save. If you turn the option off later, its buttons and menus hide, and saved specs stay.
-
2. Create the spec template and its fields Press Spec templates in the settings, or open Manufacturing, then Configuration, then Spec templates, then New. Type the template name and pick the Product categories it covers; sub-categories follow, and when two templates fit a product, the template of the closest category wins. In the Fields tab add what sales types on each line: Number with From and To, which you can mark as part of the size, such as width and height; Choice, whose options you type separated by commas and pick from a dropdown, such as hinges, sliding; Text for notes; and Attachment for the drawing or a photo. Mark each field as required or not. When you save the template, the products of these categories that have a bill of materials get the make to order and manufacture routes, so each sales line makes its own manufacturing order.
-
3. Write the component rules In the Components from sizes tab add a rule for each component whose quantity changes with the size. Write the rule with the field names in Arabic or English, with × ÷ + -; Arabic digits are accepted, and so are the functions ceil, floor, round, min and max (in Arabic: تقريب لأعلى, تقريب لأسفل, تقريب, الأصغر, الأكبر). Example: frame tubes = ceil( (width + height) × 2 × leaves ÷ 600 ). You can add a condition in the When column, such as counting the hinges only when the opening type is hinges. Components with no rule stay as in the bill of materials.
-
4. Product by choice Open a rule and, in Product by choice, pick a choice field such as Colour, then link each option to its product: black to black iron paint, grey to grey iron paint. The manufacturing order then gets the paint the customer chose, in the quantity the rule works out.
-
5. The price rule In the Price tab write a price rule if you want the unit price on the quotation worked out from the sizes once the specs are complete. Example: width × height ÷ 10000 × 1800 + product price, where product price is the sales price of the product. Salespeople can still change the price by hand, and the rule only applies while the order is a quotation.
-
6. Checks before finishing a stage In the Checks before finishing the stage tab add what the worker must confirm, such as overall size matches the drawing. Pick the Stages where the check shows; left empty, it shows at every stage. Turn on Photo when the check needs a picture, such as a photo of the gate after welding.
-
7. The quotation shows what is missing Add the product to the quotation as usual. The line shows a Specs button with the number of fields filled out of those required, such as 0/5, and under it what is missing. At the top of the order a badge shows the state of the specs, such as Specs incomplete.
-
8. Type the specs Press the Specs button on the line. The template fields appear; a missing field is highlighted until it is filled, and the allowed range shows next to each field. Attach the drawing or photos under Drawings and photos. Once complete it shows Complete, and Price from sizes when the template has a price rule; then press Save. The bottom of the window shows the version number and who typed it.
-
9. Send the specs for approval Once the specs are complete, the badge reads Specs ready to send. You have three buttons: Send specs for approval opens the mail composer with a link to the approval page, Preview shows the page as the customer sees it, and Approve on behalf of the customer is for a customer who agreed by phone. While customer approval is on, the order cannot be confirmed before approval, and a clear message says why.
-
10. The e-mail to the customer The system writes the e-mail with your company name and the order number, with a Review and approve the specs button. Read the text, change it if you want, then press Send.
-
11. The customer approves from the phone The customer opens the link and sees the approval page: the sizes, choices and notes of each product, with the drawing and the files. They sign and press Approve the specs, or press Request a change and write a note. After approval the order confirms itself, one manufacturing order is created per custom line, and an activity goes to the person responsible for the manufacturing order.
-
12. The manufacturing order and its components The manufacturing order has a Customer specs card: the values, the drawing, the files, the stages with their state, who approved and when, and the version. In the Components tab the Source column shows where each line came from: From sizes, Bill of materials, or Added by production. Production can change any line by hand. This is a normal manufacturing order, so it shows on the order tracking page with its stages and deadline.
-
13. When the specs change after work has started If the specs are edited after work has started, a new version is made, and a bar at the top of the manufacturing order says the specs changed after work started, with what changed and which stages have not started yet, plus the buttons Apply the new version and Compare the two versions. An activity goes to the person responsible for the manufacturing order.
-
14. Compare, then apply Press Compare the two versions to see each field that changed: its value in the applied version and in the new one. Then press Apply the new version, and the components are worked out again; lines no longer needed are cancelled.
-
15. The worker screen Press Worker screen on the manufacturing order or on any work order row. It shows the sizes in large type, the notes, the drawing, a tab for each stage, the checks before finishing the stage, and the Start, Pause and Finish buttons. Finish stays disabled until every check is ticked, and a check that needs a photo opens the camera. The screen suits a tablet in the workshop.
-
16. Working in several factories If your company has more than one factory, switch on Work in several factories in the same settings; it is off at first. Then press Factories and switch on Factory for each warehouse that works as a factory, and press Operations library to add the operations your factories do, such as cutting, bending, welding and painting. On each work centre pick its Factory and Operation, or press Add a work centre in each factory on the operation row in the library. The manufacturing order then has two buttons: Split between factories shares the quantity between factories, each factory gets its own manufacturing order with its quantity, and the orders stay linked to the same sales order. Move to another factory asks for the new factory and a Reason, and the steps not started yet go to the work centre of the same operation in the new factory, while finished steps stay as they are. Every split or move is logged in the Factory tab of the order and in the Work moved between factories list in Manufacturing: the date, from and to which factory, the quantity, the reason and who did it.