From the spec request to the manufacturing order: pricing first, step by step
This option suits a factory where every order is new, with no fixed template, so nobody knows the price until the design team has worked out the materials and the work. An order goes through seven stages: spec request (sales), pricing (design), quotation (sales), customer approval, buying materials (purchase), receiving materials (warehouse), and manufacturing. The pictures show an iron gate with sample data, in the Arabic interface. It needs the Sales, Manufacturing, Purchase and Inventory apps.
-
1. Turn the option on Open Manufacturing, then Configuration, then Settings, and in the Manufacturing method block turn on Manufacturing to custom designs if it is not on yet, then turn on Pricing by the design team. Under it are five numbers with ready values: the default margin, 25%, only a suggestion that sales can change on every quotation with no minimum; warn when a material price is older than 30 days; warn when a purchase is above the expected cost by 10%; the usual pricing time, 2 working days; and the default waste of materials, 5%. Press Save, and the Design and engineering app appears.
-
2. Sales asks for a price On the quotation press Custom order request. The window Pricing request to design opens: the product name as the customer sees it, which is the exact text shown on the quotation, the invoice and the delivery note, while the inner product, Custom order, never reaches the customer; then the quantity, the delivery date the customer asks for, the spec in the customer's words, the main sizes (optional), the attachments and the designer. Leave the designer empty and the request goes to the least busy designer. Press Send to design, and the line is added to the quotation by itself.
-
3. The quotation waits for design A yellow bar at the top of the quotation says it is waiting for the design team's pricing, and that the quotation can go to the customer once every custom line is priced. The line has a Pricing status column reading Pricing, with the spec and sizes under the name. Press Send or Confirm before pricing and a message explains why not; you get a notification when the price is ready.
-
4. The pricing board Open the Design and engineering app, then Pricing requests. Each request is a card in a column by its state: New, Pricing, Waiting for sales and Priced. Each card has a timer with the time left, such as 4 days left, and it turns red when the request is late, such as one day late. While the designer waits for an answer from sales, the timer stops and the card says Timer paused.
-
5. The cost sheet Open the request and press Start pricing. At the top is the seven-stage strip, with the team in charge of each stage and the days the order spent there. In the Cost sheet tab add the lines: a material from the system, a new material typed as text, a work line where you pick the work centre so its cost comes from the centre's hour cost, or another cost; waste is added by its rate. A material line has a Machine column where you pick the work line that uses the material, the same link you see in Materials of this step on the work line, so the bill of materials reads it as before. Each material shows the stock on hand and the last purchase price, and when that price is older than the limit an Old material prices bar shows with an Ask purchasing for a price button. At the bottom are the totals: materials, work, other costs and the expected cost. When you need an answer from the salesperson press Ask sales: the timer stops, and starts again by itself when the salesperson replies in the chatter. Save a version keeps a copy of the sheet before you change it.
-
6. Similar past orders In the Similar past orders tab the system searches the words of the name and the spec among orders priced before, and shows for each one the customer, when it was priced, the expected cost, the actual cost when it was made, and the match percentage. Press Copy the materials to bring its lines into your sheet, then change the quantities. When you are done press Hand the pricing to sales.
-
7. A worksheet for each production line On the work line of the cost sheet press Worksheets. A window opens with the main line of that work and a table where you add one PDF for each production line that can run this stage: the main line and its alternatives. For example, the saw cutting plan for Cutting 1 and the plasma drawing for Cutting 2. A file with no line is used on every line. The table takes PDF files only. When the customer approves, the files move with the stage into the bill of materials, so nobody uploads them again.
-
8. The price on the quotation After hand-over the price lands on the quotation line: expected cost plus margin. In the Custom orders tab of the quotation you see for each request the reference, the stage, the designer, the expected cost, the margin (%), the profit and the price for the customer. Change the margin and the price follows. When the quantity is more than one piece, the Price to the customer tab of the request shows a One piece block with Cost of one piece, Profit on one piece and Price of one piece, and the quotation tab has the cost and profit of one piece as columns. The designer never sees selling prices, and the salesperson sees only the total cost, not its lines. The quotation then goes to the customer as usual. When the company switches on Internal approval of quotations in the Sales settings, a quotation is not sent, printed or shared before it is approved: press Send for approval and the request reaches the people with the right Approve quotations in the Approvals app, on the web and the phone, who approve it, reject it with a reason or return it for changes, or use Approve the quotation and Reject the quotation on the quotation itself. Any change after the approval needs a new approval. A Designs button at the top of the quotation opens the design; when the quotation has more than one, it opens a list to choose from.
-
9. Customer approval and buying what is missing The customer approves as usual, by confirmation or signature. When the company switches on Customer acceptance before confirming in the Sales settings, the order is confirmed only with an acceptance recorded in the Approval and customer acceptance tab: a customer purchase order or an advance payment with its document number, a documented verbal acceptance saying who agreed, when and how, or a signature by the customer. A user with the right Confirm without an approved quotation can confirm an exception with a written reason. The system then creates a product and a bill of materials for this order, turns the new materials typed as text into products, creates the manufacturing order, and creates requests for quotation for the missing quantities only, after what is in stock. A material with no vendor waits in Materials to buy, in the Design and engineering app and in the Purchase app, with Choose a vendor in the purchase column. Select the line and press Buy from a vendor.
-
10. The expected price beside the vendor price The request for quotation to the vendor has two new columns: Expected, the material price from the cost sheet, and Vs expected %, beside the unit price. When you confirm a purchase above the expected cost by more than the limit in the settings, the salesperson and the designer get an alert.
-
11. The manufacturing order The manufacturing order is a normal one like any other, with the bill of materials the system made for the order. At the top is the seven-stage strip with the days in each stage, and the Components tab shows what is available and what waits for purchase. The Pricing request button takes you back to the cost sheet. Once manufacturing is done, the system compares the expected cost with the actual one and works out an accuracy percentage for the order.
-
12. The worksheet on the work order and the worker screen Open the work order, then the Worksheet tab: it shows the stage file of the line the order runs on now. Move the order from Cutting 1 to Cutting 2 and the file changes by itself, and the cost follows the hour cost of the new line. For one order only, upload a file in File for this order only and it shows instead of the stage file. On the worker screen a Worksheet button beside the stage opens the same file. The Back button on the worker screen and the shop floor takes you back to where you came from in Manufacturing.
-
13. The order pipeline Open Order pipeline. At the top is a card for each stage with the number of orders in it and the average days, with the slowest stage highlighted. Below is one row per order with its seven stages; the number in a stage is the days spent there, late ones in red, and the end of the row says who has the order now. The filters are All, Late, At design, At the customer and Waiting for materials. Press any order to open its pricing request, and from there the quotation, the purchases and the manufacturing order.
-
14. The overview The Today tab of the overview shows open pricing requests by state, the average pricing time against the target, late requests, quotations waiting at customers and the approval rate, estimate accuracy by product type, and a needs-you list of what keeps orders moving, such as requests with no designer or materials with old prices. The Team tab shows each designer's load, and Reports holds Expected against actual per order, designer and product type, Pricing time, Quotations and approvals, and Most used materials.
-
15. Hour cost from salaries Work lines on the cost sheet use the work centre's hour cost, so keep it close to reality. Open Manufacturing, then Configuration, then Work centres, pick the centre, add the employees who work on it in the Crew field, then press Compute from salaries. For each employee the system takes the monthly wage divided by the monthly hours of their work schedule, weekly hours × 52 ÷ 12, and adds them up. Example: a wage of 8,000 on a 40-hour week gives 8,000 ÷ 173.3, about 46.15 an hour. The Hour cost source field shows the number of employees and the date of the calculation. When Real production cost is on, the hour rate is built from the accounts instead: salaries, depreciation, power and the line's share of factory overheads. See the Real production cost card.