White Friday: up to 30% off your subscription 0days 0hrs 0min
Intagya
Pricing Blog Try free
← All articles

If my factory cannot make everything, what should I make this month to earn the most?

| Farha Shehata · ERP Implementation Consultant & Trainer

If my factory cannot make everything, what should I make this month to earn the most?
The short answer

Measure profit against the resource that runs out first, not the margin per piece alone. In Intagya ERP the monthly production plan reads the confirmed sales, the expected demand, the price and cost of each product, the work center hours and the materials on hand, then works out how much of each product to make for the most profit, never below the confirmed orders when they fit, and suggests an extra shift with its profit.

A small factory makes five products, and all of them pass through one assembly work center. The manager says: make the dearest first, it has the best margin per piece. But the dearest takes three hours on assembly and the cheapest takes one. By month end assembly is full, and the factory did not make what would have earned it more.

The sum in the manager's head is right for one piece. It is wrong for the month.

Why is it not enough to make the product with the best margin per piece?

Because what limits your factory in a month is not the number of pieces, but the hours of one work center or the quantity of one material. A made-up example: one product earns 300 a piece and takes 3 hours, which is 100 an hour. Another earns 150 and takes one hour, which is 150 an hour. If hours run out first, the second earns the factory more.

It gets harder when there is more than one limit: two work centers, a material short in stock, and confirmed orders that must ship before anything else.

What does the system read to build the plan?

Open Manufacturing, then Planning, then Monthly production plan, pick the month, then Load data. The plan reads:

  • Confirmed sales not delivered yet, less the stock and open orders.
  • The demand expected this month: typed, or read from the Production plan when you use it.
  • The sale price: from the product, or the average sold price over 12 months.
  • The cost: product cost, or bill of materials cost.
  • The hours of each work center in the month, and the materials on hand.

You can change any of these before calculating, along with the Extra allowed above the expected demand if you want to make for stock.

What does the result tell me?

After Calculate the plan you see for each product the planned quantity, unit profit, product profit and status: Extra, All expected, Part of expected, Confirmed only or Short of confirmed. At the top: the expected profit and the share of confirmed orders covered.

The monthly production plan: expected profit, confirmed orders covered, the limiting resource and the value of one more hour of it, then what to make of each product and the use of each resource.
The monthly production plan: expected profit, confirmed orders covered, the limiting resource and the value of one more hour of it, then what to make of each product and the use of each resource. (Arabic interface, sample data)

The most important figure is the Limiting resource: the work center or material that filled up first. Next to it, the Value of one more hour: the profit one extra hour of it would add. And a suggestion: an extra shift on that work center, for the hours a day you set, how much profit it adds and what it lets you make.

Can I try more hours or more material before I decide?

Yes. Press What if? and the plan goes back to draft. Change the hours or quantities under Resources, then Calculate the plan again and compare the expected profit. You know whether overtime or extra material pays before you spend on it.

Does the plan create the manufacturing orders?

Yes, when you press Approve and create manufacturing orders: one order per product at its planned quantity. Tick Confirm the manufacturing orders and they are confirmed once created, so missing components are requested through their normal routes. An approved plan does not change; for any change, make a new plan.

Check your costs before the first plan. If a product's cost on its card is old, its profit is wrong, and the plan will tell you to make more of it.

How is it different from the Production plan?

The Production plan answers: how much do I need to make or buy, and when, from the expected demand and stock, period by period. The Monthly production plan answers another question: when the resources cannot cover everything, which quantity of each product earns the most? The first can feed the expected demand of the second.

At the start of next month, create a plan, load the data and calculate it once without approving. Look at the Limiting resource: if it is a work center you did not expect, you now know where the next hour of overtime should go.

FAQ

Will the plan cut what I promised customers?

It never goes below the confirmed orders when the resources allow them. When they do not, the status Short of confirmed and the shortage show, and the decision is yours.

Where do the working days come from?

From the company working schedule, and you can change them. Each work center gets its hours a day times these days.

Can I make more than the demand, for stock?

Yes, up to the Extra allowed percentage of each product above the expected demand.

What if a message says the optimisation engine is not installed?

The calculation needs an engine running on the server. If you see the message, contact support.

Want to see IntagyaERP on your own workflow?

Book a demo, tell us how your business runs, and watch the system handle a real scenario from your company.

Book a demo Start free