How do I know a branch or department is close to going over its budget before year end?

| Intagya ERP Expert Team

How do I know a branch or department is close to going over its budget before year end?
The short answer

Tie the budget to cost centres and let the system compare every day. In Intagya ERP you write a budget per branch, department or project, and the Budget vs actual page shows what each centre has spent to date with a share and a colour: green under 80%, orange up to 100%, red beyond. The accounting manager gets an alert at 80% and another when it goes over.

At the December meeting the branch manager says: nobody told me we went over the maintenance budget in September. He is right. The budget sat in a file sent in January that nobody opened again.

Why do budgets fail in most small and mid-sized companies?

Because they are written once and forgotten. The budget is a figure at the start of the year; spending happens every day somewhere else. Nobody compares the two until the books are closed, and by then going over is old news you cannot fix.

The comparison itself is easy. The hard part is making it happen by itself, early enough to act.

What is a cost centre, and why do I need one before the budget?

A cost centre is the branch, department or project you spread bill and expense lines over. When you pick the centre on a supplier bill line, the system knows where that money went.

Without that, there is no real budget per department, because the system cannot tell what each one spent. So start with cost centres, then write the budget.

What does the Budget vs actual page show?

At the top: the whole budget, the actual to date, the number of centres over budget, and how much of the budget period has passed. That last figure matters more than it looks: if half the year is gone and a centre has spent 75%, it is well ahead of time.

Below, one row per cost centre with planned, actual, a meter and a badge:

  • Within limit under 80% of the budget.
  • Close to limit from 80% to 100%.
  • Over budget above 100%.

The centres closest to going over come first, so you do not hunt for them.

Budget vs actual: three cost centres with their Within limit, Close to limit and Over budget badges, and how much of the budget period has passed.
Budget vs actual: three cost centres with their Within limit, Close to limit and Over budget badges, and how much of the budget period has passed. (Arabic interface, sample data)

When does the alert come, and who gets it?

The accounting manager gets an activity on the budget once when a centre reaches 80% and once when it goes above 100%. Each alert comes once per centre, so it never turns into daily noise everyone ignores. It is checked every day and when the page opens, for confirmed budgets only.

The 80% alert matters more than the 100% one. The first gives you time to act; the second tells you what already happened.

How does the system count the actual of each centre?

From the analytic lines of each cost centre on the accounts of its budgetary position, up to today. A budgetary position is a group of accounts, such as administrative expenses or maintenance. If you plan 120,000 for maintenance at the Alexandria branch, the system compares it with what was spent on the maintenance accounts under that branch.

In practice this means one thing: a bill with no cost centre shows in no budget. Make picking the centre a habit when bills are recorded.

Does the system block spending once a budget is exceeded?

No. The page tells you and alerts you; the decision is yours: slow the spending, or change the planned amount from Open budget if things changed. We think that is right for most companies, because stopping an urgent repair bill over a figure in a table can cost more than going over.

Start this week with a small budget: three cost centres and one position each. After a month you will know which figures were realistic, then widen it.

FAQ

Do I need cost centres to use budgets?

Yes. The actual comes from each centre's analytic lines, so spending without a cost centre shows in no budget.

Who gets the over-budget alert?

The accounting manager, as an activity on the budget: once at 80% and once above 100% for each centre.

Do alerts work on a draft budget?

No. Alerts run on confirmed budgets only, so confirm the budget once it is written.

Can I change the budget mid-year?

Yes. Open budget lets you change the planned amount of any centre.